Drawings contained here illustrate items of text and some typical service and meter arrangements. Further detail on these and other types of service arrangements may be obtained from the District. All installations must comply with the current NEC at the time of installation, and local ordinances or other requirements.
- Service Brackets
- Overhead Strike to Residence
- Guying - Stiff Leg Type
- Clearances: Services Over Ground and Roofs -A
- Clearances: Services Over Ground and Roofs -B
- Service Assembly Underground from Overhead Take-off
- Metering Assembly, Self Contained, Pole Installation
- Metering Assembly, CT, Pole Installation
- Service Assembly, Overhead Temporary
- Service Assembly, Underground Temporary
- Metering Assembly, Wall Mounted, Self Contained
- Meter Location On Buildings
- Platforms For Elevated Meters
- Meter Pedestal, Self-Contained
- Meter Pedestal, Mobile Home
- Meter Pedestal, 320 Amp Service
- Meter Pedestal, CT Meter
- Meter Socket Clip Arrangement
- Meter Socket, 200 Amp, Single Phase
- Metering, Self-Contained, Overhead Service, Single Phase
- Metering, Self-Contained, Overhead Service, Three Phase
- 320 A Lever Type Bypass Meter Base (Underground)
- 320 A Lever Type Bypass Meter Base (Overhead)
- 208/120V 3-Phase 4-Wire to Serve Multiple Occupancy
- CT Enclosure Wiring, Single Phase, 400 to 800 A, Overhead
- CT Enclosure Wiring, Single Phase, 400 to 800 A, Underground
- CT Enclosure Wiring, Three-Phase, 400 to 800 A, Overhead
- Metering, Overhead Service, Three-Phase, C.T. 400 to 800 A
- Metering, Underground Service, Three-Phase, C.T., 800 A or greater
- Trench Requirements - Depth, Width, Clearances
- Underground Service, Wall Mounted Meter
- Underground Service, Meter Pedestal
- Conductors Terminated in Padmount Transformers by Customers
- Padmount Transformer Clearances
- Guard Posts for Padmount Transformers
- Intentionally Blank
- Standby Generator Schematic Connection Diagrams