Skip to content
- The District will not charge an additional fee to Customers who voluntarily comply with the District Electrical Service Requirements and Facility Access Policy within (30) thirty days of being notified by doing one of the following, provided the option chosen resolves the access issue.
- Permanently remove the safety hazard, debris or obstruction; trim or remove brush or other vegetation; or take action in any other way necessary to comply with the District's required access distances.
- If a Customer has a padlocked gate, allow the installation of a District padlock to ensure that both the Customer and District Representatives have access at all times to the Customer's property and District facilities.
- Install a lockbox of their choice on or near their gate that will allow a District padlock to be installed. The lockbox will hold the Customer key or code allowing authorized District Representatives required access.
- Program a District code, unique to each Customer, into the locking mechanism on their electronic gate.
- Keep aggressive or dangerous animals at least 25' from District equipment and pathways or otherwise kenneled, penned, or secured, thus allowing District Representatives safe access at all times to District facilities on the Customer's property
- All costs, with the exception of item "2", shall be in accordance with the current District Schedule of Deposits and Charges. Costs to Customers falling in category "2" shall be on a case-by-case basis. Customer shall sign any and all documents reasonably required by the District to assure Customer pays for the costs, fees and charges incurred