The Schedule of Deposits and Charges is updated yearly in the Spring based on updated costs to the utility.
Printable Schedule of Deposits and Charges (PDF)
Effective May 16, 2026
Deposits
Electric
- Residential: ²⁄₁₂ of estimated annual billings with a minimum deposit of $175, or as determined by the District.
- Non-Residential: ²⁄₁₂ of estimated annual billings with a minimum deposit of $175, or as determined by the District.
Water
- Residential: ²⁄₁₂ of estimated annual billings with a minimum deposit of $175, or as determined by the District.
- Non-Residential: ²⁄₁₂ of estimated annual billings with a minimum deposit of $175, or as determined by the District.
Satisfactory credit record with the District, credit assessment, or enrollment in SmartPay may allow the District to waive the deposit requirement.
Frequent overdue payments, high consumption, District-owned equipment tampering, or changes of account holders may result in additional deposit requirements.
Developer Funded Water Projects
Construction Inspection: Deposit based on anticipated labor and fleet hours as determined by the District. Project owner/Developer responsible for all construction inspection costs.
Administrative & Engineering: Deposit based on anticipated level of effort as determined by the District. Project owner/Developer responsible for all administrative, engineering & review costs over $1000.
Charges
Connect / Reconnect / Disconnect / Transfer
– applicable to standard new or existing services.
Electric
- Meter, including multiple electric meters for same account: $60
- Separate account at same service address: $30
- Using last reading, one or more meters for same account: $30
- Disconnect or reconnect remote meter, including multiple remote meters for same account: $30
- Disconnect or reconnect CT/3 Phase/at transformer/meter disconnected more than 12 months: $110
- Same account, non-remote meter (in addition to CT/3 Phase/at transformer): $30
- Same account, remote meter (in addition to CT/3 Phase/at transformer): $30
- Disconnect or reconnect non-remote Net meter: $110
Water
- Independent of electric: $65
- Simultaneous with non-remote electric: $40
- Using last reading, remote transfer, independent of electric: $30
Sewer
- Independent of electric and/or water: $20
- Simultaneous with electric and/or water: $15
Nonpayment Reconnects
Multiple meter types per account may require additional service fees.
Nonpayment Reconnects- Electric Only
(During regular business hours)
Electric meter type:
- Non-remote: $120
- Non-remote separate account, same service address: $60
- Non-remote CT/3 phase/at transformer: $220
- Non-remote CT/3 phase/at transformer, same service address: $60
- Remote: $60
Nonpayment Reconnects- Water Only
(During regular business hours)
- Water reconnect only: $130
Nonpayment Reconnects- Electric & Water
(During regular business hours)
- Non-remote: $190
- Non-remote CT/3 phase/at transformer: $300
- Remote: $190
Reconnect Requests Received Between 4 p.m. to 5 p.m.
(In addition to other applicable charges, per ½ hour of overtime incurred)
- CSR for remote electric reconnect: $50
- Personnel for non-remote electric and/or water: $75
- Personnel for electric CT/3phase/at transformer: $140
- Water personnel: $80
Reconnect Requests Received Between 5 p.m. to 7 a.m.
Electric only:
- CSR for remote electric reconnect only: $195
- Personnel for non-remote electric with water: $765
- Personnel for electric CT/3 phase/at transformer: $765
- CSR for remote electric and water tech for water reconnect: $555
Water only: (CSR also dispatched to assist customer/verify payment): $525
Late Fee
- To cover expenses related to processing past due accounts $5
Misc. Service Charges
-Alphabetical Order
Access Appointment to Read Meter
- Electric or water: $70
Access Appointment (e.g.: Maintenance & Repair)
- Electric: $195
- Water: $120
Continuous Service Contract
- New contract – Initial setup & units: $70
- Transfer reading: $30
- Restoration of services
- Non-remote electric: $60
- Water – simultaneous of non-remote electric: $40
- Water – independent of electric or simultaneous with remote electric: $65
***Refer to above sections for any variances regarding CT/320A/Remote Disconnect or After Hours/DNP for Continuous Service Contracts***
Field Collection
- And/or extension Meter Tech: $85
- Serviceman: $165
Lock Box
- Installed (one size only): $645
Meter Tampering or Diversion (Minimum – Actual Cost or Greater)
- Cut or missing seal (electric or water): $280
- Unauthorized connect or reconnect of meter (electric or water): $360
- Unauthorized solar connect: $360
- Power diversion investigation, minimum– actual cost & requires a W.O. Includes removal of meter: $615
- Water diversion investigation, minimum – actual cost & requires a W.O. Includes removal of meter: $430
Meter Testing
This is a deposit. It will be refunded if meter tests bad.
- Electric meter: $125
- Water meter: $160
Returned Payment
- Fee: $30
Reread Meter
- (Customer request due to high consumption): $70
No Charge if reading is incorrect
Remote Read Meter Opt Out Charges
“PUD-Read” Remote Read Opt Out Fee
- Monthly fee, bi-monthly read: $28
Analog Meter Fee
- (per month in addition to applicable opt out fee): $8
Other Misc. Service Charges
-Alphabetical Order
Assessment Segregation (Water)
- Minimum deposit: $515
Customer Service Conversion
- Convert overhead service to underground service: $270
- Change meter base to larger meter base size: $305
- Upgrade overhead service wire to larger size: $625
Easements & Other Recorded Documents
- Easements: $755
- Replacement Easements / Quit Claim Deeds: $755
- WSDOT Franchise Amendment: $2,305
Engineering, Estimate, & Service Availability Charges
- for Developer Proposals: Actual Cost over $1,000
- Electric Construction Estimate Fee (does not include connect estimates): $50
Fire Hydrant Fund
Exception: when a hydrant is required in a specific location by other regulatory authority, the customer will pay the actual cost of installation: $9.72/ft. (6 inch and larger mains)
Increased Loads
Add service conversion charge when a transformer upgrade is required to maintain adequate capacity for a service upgrade.
Add connect charge for new services.
- Single overhead transformer: $1,345
- 2 overhead transformers: $1,6305
- 3 overhead transformers: $1,950
- Single padmount transformer: $470
- 2 single-phase padmount transformers: $925
- Three-phase padmount transformer: $925
Transformer Installation
This does not include the New Service Connect Charge
- Install single-phase overhead transformer: $1,580
- Install V-phase overhead transformer: $2,565
- Install three-phase overhead transformer: $3,860
- Install single-phase pad-mount transformer: $1,020
- Install three-phase pad-mount transformer: $1,050
- Install 2 single phase pad-mount transformers: $1,085
Trip Charge
(Customer not prepared for scheduled work or main disconnect not off)
- Electrical Serviceman: $195
- Line Crew: $465
- Water Serviceman: $120
- Meter Reader: $70
Vegetation
- Removal and/or fee: $100
Yard Lights
- Install light only, along with new service: $145
- Install light only, established account: $535
New Service Connect Charges
– includes connect charge and engineering charge.
Capacity Charge for Residential New Service Connections
| Service Voltage | Service Size | ||||
|---|---|---|---|---|---|
| 200A | 320A | 400A | 600A | 800A | |
| 240V single-phase | $1,200 | $1,632 | $1,920 | $2,640 | $3,360 |
| 480V single-phase | $1,920 | $2,784 | $3,360 | $4,800 | $6,240 |
| 208V three-phase | $2,520 | $3,168 | $3,600 | $4,680 | $5,760 |
| 240V three-phase | $2,688 | $3,438 | $3,936 | $5,184 | $6,426 |
| 480V three-phase | $3,936 | $5,430 | $6,426 | $8,922 | $11,418 |
Capacity Charge for Non-Residential New Service Connections
| Service Voltage | Service Size | |||||||
|---|---|---|---|---|---|---|---|---|
| 200A | 320A | 400A | 600A | 800A | 1200A | 1600A | 2000A | |
| 240V single-phase | $2,000 | $2,720 | $3,200 | $4,400 | $5,600 | |||
| 480V single-phase | $3,200 | $4,640 | $5,600 | $8,000 | $10,400 | |||
| 208V three-phase | $4,200 | $5,280 | $6,000 | $7,800 | $9,600 | |||
| 240V three-phase | $4,480 | $5,730 | $6,560 | $8,640 | $10,710 | $14,870 | $19,030 | $23,180 |
| 480V three-phase | $6,560 | $9,050 | $10,710 | $14,870 | $19,030 | $27,340 | $35,660 | $43,970 |
Electric – Overhead
Self-contained meter only
- Single Phase – Connect to existing Overhead Transformer: $765
(Inc. OH Triplex svc to cust bldg) - Three phase – Connect to existing overhead transformers: $1,415
(Inc. OH Quad svc to cust bldg)
Electric – Padmount
Self-contained meter only
- Single-phase – Connect to existing padmount transformer: $615
- Three-phase – Connect to existing padmount transformer: $710
- 2 single-phase – Connect to existing padmount transformers: $660
Electric – Others
- Additional meter(s) at a multiple installation involving a single service run
- Each additional meter installed with original connection in a multi-pack: $65
- Additional charge for each meter installed at a later time than original connection in a multi-pack: $115
- CT Meter Connection (in addition to one of the above)
- Up to and including 800 AMP: $295
- Greater than 800 AMP: $415
- Net Meter Installation
- Application fee: 0 W – 25 kW: $100
- Application fee: 26 kW – 500 kW: $500
- Application fee: 501 kW – 20 MW: $1,000
- Standard Meter / AMR Meter: $225
- CT Meter / AMR-CT Meter: $420
- Interconnection Expansion: $225
- Radio-Read Meter Installation
- CT Meter: $325
- 3-Phase – new Time & Materials only: T & M
- Temporary Service – in addition to above: $170
Transformer Installation and New Service Connect Charges
- Temporary Service – Community Sponsored Festival Only, includes KWH consumption: $265
- Unmetered installations – single-phase, overhead installation: $550
- Connection to existing transformer
Water
- Drop-in Meter 5/8×3/4-inch radio read meter installed in an existing meter setter: $525
- Drop-in Meter 1-inch radio read meter installed in an existing meter setter: $750
- Pressure Reducing Valve
- Upgrade service to include 3/4 inch Pressure reducing valve: $1,810
- Upgrade service to include 1 inch Pressure reducing valve: $2,150
- Drop-in pressure reducing valve into existing tandem setter – 3/4 inch only: $255
- New Water Service Installation
| Meter Size | Meter Installation | Capital Facilities Charges | Total | Pressure Regulator Valve (if required) |
|---|---|---|---|---|
| 5/8 inch x 3/4 inch | $ 6,545** | $8,407 | $ 14,952 | Included* |
| 1 inch | $ 6,800** | $21,018 | $ 27,818 | Included* |
| 1-1/2 inch | At Cost | $42,037 | At Cost + C.F. | At cost |
| 2 inch | At Cost | $67,260 | At Cost + C.F. | At cost |
| 3 inch | At Cost | $134,520 | At Cost + C.F. | At cost |
| 4 inch | At Cost | $210,188 | At Cost + C.F. | At cost |
| 6 inch | At Cost | $420,376 | At Cost + C.F. | At cost |
| 8 inch | At Cost | $672,601 | At Cost + C.F. | At cost |
| 10 inch | At Cost | $966,865 | At Cost + C.F. | At cost |
*Included with service installation if, in the opinion of the District, one is needed.
**Includes road crossing if required (35-feet max paved roadway, non-WSDOT)
Note: Please contact the Water Department to determine applicable charges.
Fire Hydrant Use – Temporary Service
- Hydrant Use Permit: $870
(Includes connection to hydrant, 90 days use, and up to 3000 cubic feet of water. Additional water use billed at commercial rate. District may assess an additional permit fee for usage beyond 90 days)
2) Meter usage/damage deposit: $995
3) RPBA usage/damage deposit: $500
Sewer
- Check Valve Assembly: $455
- Inspect Customer Connection: $475